CEP

The CEP (Companhia Energética de Petrolina) has a power generation capacity of 191 MW/h through a thermal unit located in the state of Pernambuco (PE), a PCH (small hydroelectric plant) in the state of Minas Gerais (MG), and two wind plants located in the states of Ceará (CE) and Piauí (PI). It has become a model company among Brazil's new power plants, contributing significantly to the socioeconomic development of the regions where it operates.
Also check out:

THERMAL UNIT

Located by the banks of the São Francisco River, in the heart of Pernambuco’s backlands, CEP occupies a five-acre perimeter within a private area of 147 acres. Studies, infrastructure deeds, and the acquisition of state-of-the-art equipment and software were conducted to ensure the safe supply of energy as agreed with the Federal Government.

The plant consists of eight engines capable of reaching 128 MW/h, sufficient to supply a city of up to 500,000 inhabitants. It is considered one of the most modern power plants in the country, a source of pride for the entire technical team involved.

HIDROELÉTRICA AREIA BRANCA

Located in Caratinga (MG), this hydroelectric plant was built on the Manhaçu River and is composed of two vertical KAPPLAN turbines. With a generation capacity of 19.80 MW/h and a guaranteed output of 10.40 MW/h, its production is fully contracted with Centrais Elétricas Brasileiras S.A. (Eletrobrás) until 2030, through the Incentive Program for Alternative Sources of Electric Energy (PROINFA).

EÓLICA PEDRA DO SAL

Located in Parnaíba (PI), this wind farm consists of 20 WOBBEN ENERCO E-44 wind turbines, totaling 18 MW/h installed capacity, with authorization valid until 2032. The guaranteed energy output is 6.73 MW/h, and it is commercialized under the Incentive Program for Alternative Sources of Electric Energy (PROINFA) until 2028.

EÓLICA BEBERIBE

Situated in Beberibe (CE), this wind farm consists of 32 WOBBEN ENERCO E-48 wind turbines, totaling 25.80 MW/h installed capacity, with authorization valid until 2033. The guaranteed energy output is 9.65 MW/h, and it is commercialized under the Incentive